The improvements to SR 82 for this project consisted of adding lanes, reconstruction, milling and resurfacing, widening, base work, shoulder treatment, drainage improvements, curb and gutters, sidewalks, signing and pavement markings, lighting, and borrow pit construction. The project began east of Shawnee Road, easterly approximately three miles, to east of Alabama Road in Lee County for a total of over four miles.
EHC provided more than 345,000 cubic yards of excavation, approximately 200,000 square yards of subgrade Type B stabilization, nearly 312,000 cubic yards of embankment, optional base groups 1, 6, 9, and 10, and clearing and grubbing for the project.
In addition, AJAX Paving engaged EHC to expand SR 82 between Colonial Boulevard through the Daniels Parkway intersection to six lanes. EHC provided 580,000 cubic yards of excavation including an off-site borrow pit, subsoil excavation, over 600,000 cubic yards of embankment, surcharge embankment, more than 300,000 square yards of Type B stabilization, and optional base groups 1, 4, 6, 9 and 10 for the nearly 4.5-mile project.